Structure · Owner planning
Planning an Earthquake-Resistant House in Panama
By Arthur · November 7, 2026

Earthquake planning belongs on the table early, while the site, the layout, and the structural approach can still be considered together. As the owner, you can ask clear questions, keep the answers, and make sure changes reach the people responsible for the design.
This is a meeting brief, not a structural design. It doesn't select foundations, wall thicknesses, reinforcement, connections, or spans. I have worked in steel detailing and on construction drawings, including in Panama, and I still treat those decisions as the engineer's to make and explain.
Start with the ground under the house
USGS identifies earthquake magnitude, proximity to the fault, geology, and soil type among the factors that influence shaking at a site. [1] A regional description can't answer every question about an individual property.
The first question for the design team is what information they need before selecting a structural approach. Which investigations should a geotechnical professional undertake? Which site hazards require assessment? What remains uncertain, and who is responsible for resolving it?
Give those reports a place in the project records. A neighboring house, or a photograph of another foundation, isn't a substitute for a site assessment.
What “the Panama code” actually means on your site
SINAPROC's official technical-norms directory identifies the Reglamento Estructural Panameño (REP) and the Junta Técnica de Ingeniería y Arquitectura (JTIA), and describes the regulation's role in structural design for seismic, wind, and other actions. [2]
Panama City's municipal publications directory also lists structural-regulation references, including REP-2021 adoption and subsequent provisions. [3] That directory is a useful starting point, not proof that one listed document is the complete current requirement for every municipality or project.
Have the local design team identify the applicable regulations, amendments, and approval process for the particular site. Record the answer with the drawings rather than relying on a website summary.
Have the engineer explain the whole system, not just the material
A material name is only the beginning of the story. “Steel,” “concrete,” or “masonry” should lead to a discussion of the proposed system and its details, not a promise that a material alone guarantees safety.
These are the questions I take to the structural engineer:
- Why does the proposed system suit this site and layout?
- How do large openings, roof form, and changes in level affect it?
- Which details or substitutions must not change without review?
- How will structural drawings be coordinated with architecture and services?
- What inspections and construction records are required?
Separate what the design is meant to do from what it can't promise
Have the engineer explain what the design is intended to achieve and what outcomes aren't guaranteed. Avoid the blanket label “earthquake-proof.” USGS emphasizes the importance of geology, engineering, and the behavior of structures and their contents during shaking. [4]
| Owner question | Who should explain it | What to retain |
|---|---|---|
| What site information supports the design? | Geotechnical and structural professionals | Reports and stated assumptions |
| What performance objectives apply? | Structural engineer | Written explanation of objectives and limits |
| Which regulations and approvals apply here? | Responsible local design team and authority | Applicable references and approvals |
| Who reviews equipment, ceilings and other nonstructural items? | Relevant designers and specialists | Assigned responsibility and coordinated details |
| How are changes checked during construction? | Responsible designer and construction team | Revisions, inspection records and decisions |
This is an owner checklist, not a code-compliance table. It contains no seismic ratings or certification of any project. Nonstructural items have their own discussion in equipment, ceilings and other nonstructural items.
Keep decisions traceable on site
Keep one current set of approved drawings, with a clear record of revisions. Ask the responsible professionals how questions, substitutions, and unexpected conditions should be reported before work proceeds.
Photographs can document visible progress, but they shouldn't be presented as proof of hidden reinforcement or full compliance. Likewise, a completed building's appearance doesn't establish its earthquake performance.
The project pages describe houses I have worked on. They aren't seismic certifications. For earlier planning questions, start with the guides. When bids come in, I use the quote comparison.