Completed
Bastimentos island
A house Arthur designed and built on Bastimentos island, Panama. An owner-builder project, shaped by its island setting.
A builder’s perspective · Panama
Good homes begin with a clear understanding of place. Explore real projects, the choices behind them, and the work of turning an idea into a house.
Explore the projects ↗New · The long view
Travel through the Americas, Africa, Asia and the Pacific to discover different building traditions, how they changed, and what today’s homeowners can learn.
Read the illustrated feature ↗The project journal
Completed
A house Arthur designed and built on Bastimentos island, Panama. An owner-builder project, shaped by its island setting.
In progress
A current build. Follow the project as its design and construction story is documented.
Planned
A second house is planned for a 1,500 m² finca. The land area is not the proposed house size.
Experience, beyond one discipline
Arthur’s experience spans custom home design and construction, masonry, stucco and steel detailing, with work in the Chicago area and Panama.
Meet the builder ↗Before you build
The site, the weather and the way you want to live should shape the brief before a floor plan does.
Read the planning notes ↗Practical guides · Research first
Compare Panama house-building proposals by floor area, scope, exclusions and allowances before judging the price per square metre.
Compare tropical roof options by heat, rain, condensation, maintenance and documented product limits, not just the roofing sheet price.
Understand indoor humidity, record useful observations and prepare better questions about moisture in a tropical house without guessing at the cause.
Practical guides · Research first
Build a room-by-room cooling brief for a tropical house, coordinating shade, natural ventilation and air-conditioned spaces before construction.
Prepare questions about the site, structural design, local requirements and construction records before building an earthquake-resistant house in Panama.
Practical guides · Research first
Organize a practical house handover file with equipment records, operating instructions, outstanding items and maintenance responsibilities.
Practical guides · Research first
Understand the limits of termite shields, check product claims and prepare a documented prevention and inspection plan with a qualified local professional.
Separate rainwater collection volume from water quality, compare illustrative rainfall volumes and plan testing, materials and maintenance for the intended use.